DOCUMENT COMPLETION INSTRUCTION
Part Submission Warrant

Key Points

The Part Submission Warrant (PSW) is a document that affirms the ability of the supplier to deliver products that meet Kasai UK requirements.

The KSPQP Part Submission Warrant is a summary document and should be accompanied by the documents required by Kasai UK. The supplier will agree these documents with Kasai UK prior to submission of the warrant.

Minimum Content Requirements

A separate PSW shall be raised for:

  • each part number or group of part numbers relating to a part family.
  • each supplier plant location.

A new PSW shall be raised following the introduction of new equipment/ tooling/ production facility.

If the PSW applies to a specific manufacturing line, this should be clearly stated in the 'Other' field.

Document Description

Item Completion Instructions
Project Kasai UK Vehicle / Power train project for which the product has been developed / manufactured.
Document Reference No. The Suppliers reference no. for the document.
Supplier Name Supplier Company name.
Supplier Plant Location at which the product was produced.
Supplier Code Unique code to each supplier, issued by Renault / Nissan Purchasing Dept.
Author The name of the person who completed the document
E-mail The E-mail address of the person who created / revised the document.
Tel The telephone number of the person who completed the document
Part Name The part name or description as identified on the product drawing
Part No. & Issue Level: As issued by Kasai UK design department
If the PSW covers more than one part number, complete the part number details sheet and attach it to the PSW.
Design Note No. The design note number relating to the product that has been manufactured
Drawing No. As issued by Kasai UK design department
Control Plan Reference / Version The reference and the issue level of the Control Plan used for the manufacture of the parts.
Control Plan Revision Date The date that the control plan was revised/ re-issued.
Average Weight The average weight of five parts, in kilograms.
Plant The Kasai UK assembly plant that will use the parts.
First Part Delivery Date The date on which the first parts covered by the PSW will arrive in the relevant Nissan plant(s).
Reason for submission Check (tick) the appropriate box(es).
Details / Other Any appropriate information to explain the reason for submission.
Items attached to this Submission Warrant Tick the appropriate box(es).
For each supporting document, indicate the issue level and date on an attached list
Submission Acceptability Tick the appropriate box(es).
Tick the Yes / No boxes as applicable. If "NO", add an explanation.
Declaration Sign to confirm statement including printed name, position and date.

For rules related to document submission, refer to the Submission Rules page.